Earthworks, excavation and rock cutting

Excavation in soil, cutting in rock, engineered fill and site preparation, through to a formation ready for building or paving. At Mekorot's Ein Kerem station we excavated and cut 84,571 m³.

Level⁦−1.50⁩

What we do

On most of our Jerusalem projects the dig goes through both soil and rock. We handle both, down to the level on the drawings.

At Mekorot's Ein Kerem station, a station and reservoir on Jerusalem's fifth water supply system, we excavated and cut 84,571 m³ between 2017 and 2019. At the Pierre Koenig underground car park we carried out excavation, rock cutting and fill works for Shikun & Binui – Solel Boneh. At Migdal Tzedek National Park we rehabilitated a quarry for the Quarry Rehabilitation Fund: earthworks, walking trails and viewpoints.

At Hadassah Ein Kerem we cut rock for the foundations of the inpatient tower (2008). At Rafa Laboratories in Har Hotzvim (2010) we prepared the ground for the building's foundations, and supplied and spread selected fill on site.

Surplus soil does not have to leave the site. Where possible, we crush it, screen it and put it back into the project as fill or sub-base. And at Sanhedria HaMurchevet, a receiving site approved by the Jerusalem Municipality, we placed more than 300,000 m³ of fill from imported and recycled local material, including surplus excavation from the Eden compound and Heichal Shlomo.

What's included

  • Site preparation and levelling
  • Excavation in soil and cutting in rock
  • Rock cutting for building foundations
  • Engineered fill and compaction
  • Supply and spreading of selected fill
  • Sub-base works
  • Recycling of surplus soil and reuse on site
  • Internal haulage and removal of surplus

Typical quantities

  • 84,571 m³excavation and rock cutting

    Mekorot station, Ein Kerem (2017–2019)

  • More than 300,000 m³ of fill from imported and recycled local material, and approx. 159,000 m³ of excavation and rock cutting

    Sanhedria HaMurchevet

  • Approx.64,500 m³excavation and rock cutting

    approx.25,500 m³select fill

    Route 4711, Elad (2017–2018)

  • Approx.76,000 m³excavation and rock cutting

    Pierre Koenig car park

  • 2,763 m³imported selected fill

    approx.8,900 m³excavated material sorted and screened for reuse as fill

    Pierre Koenig car park

  • Approx.14,650 m³cut and fill with site-won material

    approx.34,000 m²stripping

    quarry rehabilitation, Migdal Tzedek National Park

  • 20,000 m³excavation and rock cutting

    13,200 m³excavated material processed for reuse as fill (contract quantities)

    Kfar Etzion, Tzofit neighbourhood

The works are being carried out in response to the complexity of the project, at the required standard of execution and to our complete satisfaction.

Ofir RavivCEO, Shikun & Binui – Solel BonehFrom a letter of recommendation, 2023 · Pierre Koenig project · Translated from Hebrew

Sample projects

Have a site that needs to be brought to level?

Send us the drawings and the survey, and we'll come back with a construction proposal.

Talk to us