Route 437 accident black spots
- Client
- Netivei Israel – National Transport Infrastructure Company (approved executing contractor)
- Location
- Route 437, Anatot–Mishor Adumim
- Years
- 2018–2020
The road structure from sub-base to surface course, and the drainage, lighting and traffic arrangements around it. We have worked for Netivei Israel, the Ministry of Construction and Housing, Elad Municipality and the Yarkon River Authority.
Level±0.00

We build, widen and rehabilitate roads, and complete everything around the carriageway: drainage, lighting, safety barriers, paths and development works.
On Route 437 we treated accident black spots for Netivei Israel as an approved executing contractor: retaining walls, horizontal drilling, culverts, lighting, milling, carriageway rehabilitation and overlay, and traffic arrangements. On Route 4711, the northern access road to Elad, we widened the road and its shoulders for the Ministry of Construction and Housing (2017–2018): approx. 64,500 m³ of excavation and rock cutting, approx. 59,000 m² of asphalt courses, drainage, water lines, safety barriers, a cycle path, sidewalks and landscaping. For the lighting system we removed the existing poles, dug cable trenches, built 90 pole foundations and installed approx. 100 LED luminaires.
Between 2022 and 2024 we were Elad Municipality's framework contractor: several projects, each with its own bill of quantities. Among them the city cycle path, approx. 3.4 km, the rehabilitation of Quarter H, squares, accessible pedestrian crossings, milling and carriageway overlay, and ongoing maintenance across the city.
40 dunams(1 dunam = 1,000 m²) of public open space, lawns and playgrounds
Shalva Center, Bayit Vegan (2009–2013)
Approx.64,500 m³excavation and rock cutting
approx.36,500 m³fill and subbase
approx.59,000 m²asphalt courses
approx.11,100 mkerbs and edging
90lighting foundations
approx.100LED luminaires
Route 4711, Elad (2017–2018)
Approx.22,000 m²stone mastic asphalt surface course
approx.4,600 tdense asphalt concrete
approx.21,800 m²milling
Route 437 black spots
A cycle path of approx. 3.4 km; in phase 2: approx. 14,300 m² of asphalt, approx. 30,700 m³ of fill from recycled construction material and 252 lighting columns
Elad Municipality (2024)
Approx.15,000 m²stripping (approx. 15 dunams)
approx.2,500 m²polymer-stabilised path surface
Abu Rabah, Yarkon River (2022)
The company met the project's complex schedules without fail.




Send us the bill of quantities, and we'll come back to you with a proposal.
Talk to usRegistrar of Contractors, Branch 200 (roads, infrastructure and development), classification C-4 (contractor no. 24244). Registered as a contractor and supplier with the Engineering and Construction Division of the Israel Ministry of Defense, Branch 200, C-4, nationwide. Recognised Contractor for Government Works. ISO 9001:2015, with the scope "road works, earthworks, infrastructure and development".