Shalva Center, Bayit Vegan
- Client
- Shalva
- Location
- Bayit Vegan, Jerusalem
- Years
- 2009–2013
Retaining walls, anchored walls, shotcrete and capping beams that hold a slope, a rock face or a road. At Mekorot's Ein Kerem station we applied 2,224 m² of shotcrete.
Level−6.00

Excavating in a slope or beside a road opens a face that has to be held, temporarily or permanently. We build the stabilisation system together with the excavation, with the same crew and on the same programme.
The Shalva Center in Bayit Vegan (2009–2013) is one of the projects with the most complex shoring systems built in Israel — a shoring wall almost 40 m high. We built anchored walls and strengthening walls there, stabilised slopes and installed a system that monitors the load on the retaining wall. At Mekorot's Ein Kerem station (2017–2019) we built a shoring and wall-support system, reinforced concrete walls, 2,224 m² of shotcrete and 362 m³ of capping beams. At Hadassah Ein Kerem we built a system of retaining walls beside the inpatient tower and stabilised the slopes. At Sanhedria HaMurchevet we carried out ground stabilisation, a fill embankment reinforced with membranes, retaining walls and landscape walls, and on Route 437, retaining walls along the road. At the Jerusalem Light Rail depot (2019) we strengthened the foundation of an existing retaining wall with 77 rock bolts and a sprayed concrete wall. At Givat Ram and at the Binyanei HaUma railway station we stabilised slopes as part of the excavation works (2006–2009).
2,224 m²shotcrete
Mekorot station, Ein Kerem (2017–2019)
362 m³capping beams
Mekorot station, Ein Kerem (2017–2019)
A shoring wall almost 40 m high: approx. 8,700 m of permanent anchors, approx. 4,050 m of micropiles and 703 m² of shotcrete
Shalva Center, Bayit Vegan
Approx.105,500 m²reinforcing membranes in the fill embankment
approx.1,340 m³reinforced concrete walls
approx.2,100 m²reinforced-earth walls
approx.2,350 mrock bolts
Sanhedria HaMurchevet
Approx.1,260 m³concrete gravity walls
Route 437 black spots
77rock bolts, 10 m long
approx.215 m³sprayed concrete wall
Jerusalem Light Rail depot (2019)
The company carried out the above works with praiseworthy diligence and excellent workmanship, responding to the complexity of the project, with strict adherence to the project's schedules and objectives, and in full and continuous coordination with the management team.




Send us the structural drawings and the geotechnical report.
Talk to usRegistrar of Contractors, Branch 200 (roads, infrastructure and development), classification C-4. ISO 9001:2015, with the scope "road works, earthworks, infrastructure and development".