Timeline 1999–2026

Every project backed by a source in the company's records, in chronological order. One line per project; projects with a full page are linked.

  1. 1999

    Company founded

    Ofer & Nir Ltd. incorporated on 6 September 1999

  1. 2002

    Activities expanded

    Demolition of buildings, excavation, and crushing and recycling of construction waste and surplus soil

  2. 2003–2016

    A decade at Hadassah, Ein Kerem and Mount Scopus

    Hadassah Medical Organization

    Excavation and shoring, foundations, infrastructure, retaining walls and maintenance, inside a working hospital; at the inpatient tower approx. 200,000 m³ of shoring, excavation, rock cutting and recycling, in 24-hour shifts

  3. 2004

    Registration with the Registrar of Contractors

    Contractor no. 24244

  4. 2005–2006

    Givat Massuah hotel

    A. Arenson (developer: Hadassah Women's Organization)

    Excavation and shoring, recycling of surplus soil, underground infrastructure, retaining walls and development

  5. 2005–2006

    Malha railway station

    Ken HaTor Engineering and Construction (developer: Israel Railways)

    Recycling of construction waste, excavation, aggregates, underground infrastructure, paving and development

  6. 2006–2007

    Binyanei HaUma railway station (underground)

    Ken HaTor Engineering and Construction (developer: Israel Railways)

    Demolition of a building and underground passages, excavation in soil and rock, recycling, slope stabilisation

  7. 2006–2007

    Ispro Center — mall and hotel, Hadassah Ein Kerem

    A. Arenson (developer: Ispro)

    Excavation and shoring, foundations, underground infrastructure, retaining walls, paving and landscaping

  8. 2006–2007

    Biotechnology laboratory park, Hadassah Ein Kerem

    Minrav

    Excavation and shoring, foundations and columns, underground infrastructure, retaining walls, paving

  9. 2006–2013

    Maintenance and rehabilitation of roads and infrastructure, Hadassah Ein Kerem and Mount Scopus

    Hadassah Medical Organization

    Rehabilitation of roads and sidewalks, renewal of water, sewage, electricity and communications infrastructure, new parking

  10. 2007–2008

    Car park building, Hadassah Ein Kerem

    Shapir Civil and Marine Engineering

    Excavation and rock cutting, recycling, foundations, sewage and drainage

  11. 2007–2009

    School of Engineering, Hebrew University of Jerusalem, Givat Ram

    Hebrew University of Jerusalem (Phase 1); Minrav (Phase 2)

    Demolition of four buildings, shoring, excavation in soil and rock, infrastructure, retaining walls

  12. 2008

    Hadassah Ein Kerem inpatient tower, Phase 1 — excavation and shoring

    Ashtrom Jerusalem

    Demolition of an existing building, shoring, excavation and rock cutting and recycling — approx. 200,000 m³, in 24-hour shifts

  13. 2008

    Kadouri commercial complex, Talpiot

    Kadouri Brothers

    Demolition, stabilisation, excavation and rock cutting for a commercial building and an underground car park; approx. 78,000 m³

  1. 2010

    Rafa Laboratories, Har Hotzvim

    Rafa Laboratories

    Excavation in soil and rock, removal and replacement of contaminated soil, retaining walls, selected fill

  2. 2010

    ISO 9001 certification

    Original certification 23 March 2010, to ISO 9001:2008; current standard ISO 9001:2015

  1. 2009–2013

    Shalva Center, Bayit Vegan

    Shalva

    Three phases: excavation, shoring, foundations and development; a shoring wall almost 40 m high, 40 dunams (1 dunam = 1,000 m²) of public open space

  1. 2011–2013

    Hadassah Ein Kerem inpatient tower, Phase 2 — development and infrastructure

    Shikun & Binui – Solel Boneh

    Retaining walls, slope stabilisation, paving, provision for the light rail; approx. 14,800 m³ of excavation

  2. 2011–2013

    Inpatient tower drainage and stormwater, Hadassah Ein Kerem

    Electra

    Main sewage line and main drainage line connecting the tower

  3. 2011–2014

    Rehabilitation of the main water system, Hadassah Ein Kerem

    Hadassah Medical Organization

    Ring main, emergency reservoirs and pressure-reducing station; approx. 2.5 km of steel mains up to 12″ diameter

  4. 2011–2013

    Even Vesid quarry, Modi'in

    Even Vesid (Readymix Group)

    Crushing, screening and processing of aggregates, at a quarry with an output of approx. 2.5 million tonnes a year

  5. 2012–2013

    Logistics centre, Kibbutz Eyal

    Stern Ram Tzach

    Rock crushing, recycling of surplus soil and aggregate processing

  6. 2012–2013

    Shoham industrial park

    Magnesi Infrastructure; Kal Binyan

    Rock crushing, recycling of surplus soil and aggregate processing

  7. 2012–2013

    State Comptroller's building

    Shikun & Binui – Solel Boneh

    Excavation and rock cutting; approx. 46,000 m³

  8. 2013

    Cinema City, HaLeom car park, Jerusalem

    New Lineo Cinema

    Excavation and rock cutting on the bus car park site; approx. 12,800 m³

  9. 2015

    Recognised Contractor for Government Works

    First certificate

  10. 2015–2018

    Eden compound, Eliash Street

    R.Y.A. C 1 and Investments Ltd.

    Excavation and shoring in two phases; more than 90,000 m³ excavated and recycled, 74 controlled blasts

  11. 2016

    Heichal Shlomo, Jerusalem

    Heichalei HaMelech Shlomo Ltd.

    Excavation and shoring; 80,000 m³ of excavation and rock cutting, all recycled and taken to Sanhedria HaMurchevet

  12. 2017–2019

    Mekorot station, Ein Kerem

    Mekorot

    84,571 m³ of excavation and rock cutting, and treatment of tens of thousands of tonnes of contaminated soil

  13. 2017–2021

    Sanhedria HaMurchevet

    Sanhedria HaMurchevet Ltd.

    Access road on a receiving site authorised by the Jerusalem Municipality: more than 300,000 m³ of fill, approx. 159,000 m³ of excavation and rock cutting

  14. 2017–2018

    Route 4711, Elad

    Ministry of Construction and Housing

    Northern access road to Elad: approx. 64,500 m³ of excavation and rock cutting, approx. 59,000 m² of asphalt, drainage, water lines, safety barriers, cycle path, sidewalks and lighting

  15. 2018–2020

    Route 437 accident black spots

    Netivei Israel (approved executing contractor)

    Gravity walls, excavation, milling and overlay, safety barriers and lighting

  16. 2019

    Jerusalem Light Rail depot

    Strengthening the foundation of a retaining wall: 77 rock bolts, sprayed concrete wall

  1. 2020–2022

    Quarry rehabilitation, Migdal Tzedek National Park

    Quarry Rehabilitation Fund

    Walking trails and viewpoints; approx. 34,000 m² of stripping, approx. 390 trees

  2. 2021–2023

    Blue Line — northern portal, Golda Meir Boulevard

    Moriah – Jerusalem Development Corporation

    Enabling works for the tunnel excavation; approx. 12 km of utility ducting

  3. 2021–2024

    The Japanese pagoda, Jerusalem Botanical Gardens (Hebrew University)

    Jerusalem Botanical Gardens (Hebrew University)

    Japanese timber display pavilion: earthworks, micropiles, retaining walls, foundations

  4. 2022

    Abu Rabah and surroundings

    Yarkon River Authority

    Two car parks, an access road and a riverside path with a polymer-stabilised surface

  5. 2022–2024

    Framework contractor, Elad Municipality

    Elad Municipality

    A cycle path of approx. 3.4 km, Quarter H rehabilitation, squares, accessibility works, milling and overlay, and maintenance across the city

  6. 2023–2024

    Pierre Koenig underground car park

    Shikun & Binui – Solel Boneh

    Excavation and rock cutting, demolition and recycling; approx. 76,000 m³

  7. 2024–2026

    Kfar Etzion – Tzofit neighbourhood

    Mofet Etzion Cooperative Society

    Infrastructure and development for 29 housing units; 20,000 m³ of excavation and rock cutting (contract quantity)

  8. 2025

    Registered as contractor and supplier with the Israel Ministry of Defense

    Engineering and Construction Division, valid until December 2030

  9. 2025–2026

    Gatti Malha 6–7

    Excavation and shoring, in progress; 55,000 m³ (planned scope)

  10. 2025–2026

    Beit HaLohem Tel Aviv

    Zahal Disabled Veterans Organization

    Main entrance and granolite surfaces, completed; approx. 3,000 m²

  11. 2026

    Beit HaLohem Jerusalem

    Zahal Disabled Veterans Organization

    In progress; phase 1: approx. 2,300 m² of granolite surfaces and a new lighting system

  12. 2026

    Beit HaLohem Haifa

    Zahal Disabled Veterans Organization

    Completed